Sim­ply ex­p­lai­ned: Your new hea­ting sys­tem

Dear tenants, we would like to inform you: Your heating system is being replaced. During the work, it may sometimes be a little noisy or uncomfortable for you. Thank you in advance for your understanding and patience!

 

Dear tenants,

We would like to inform you about the planned modernization measures in our building.

The aim is to replace the existing decentralized night storage heaters with a modern and efficient central heating system with a heat pump. This contributes to climate protection, reduces energy costs in the long term, and increases living comfort.

 

Background of the measure

The existing night storage heaters are technically outdated and consume a lot of electricity. In the future, heat supply will be provided centrally by a heat pump. This uses environmental energy and operates significantly more efficiently and environmentally friendly.

 

Planned work in the apartments

  • Dismantling of night storage heaters: All old devices will be professionally dismantled and disposed of.
  • Installation of radiators: New radiators will be installed in the living rooms and connected to the central heating system. The number and position are based on the optimal heat supply of the rooms.
  • Laying of new heating pipes: Heating pipes will be run along the ceiling through the apartment and connected to the radiators. Where necessary, small wall or floor openings will be made and professionally sealed after completion of the work.
  • Adjustment of the electrical installation: The connections of the previous night storage heaters will be removed. The lines will be safely decommissioned.
  • Installation of thermostat valves: Each radiator will be equipped with a thermostat valve, so that you can regulate the room temperature individually.

 

Work in the building

Additionally, on 14.10.25, core drilling will be carried out in the stairwell. We recommend that noise-sensitive residents do not stay in the building on this day. The drilling will take place between 08:00 a.m. and 5:00 p.m.

Furthermore, work will be carried out in the stairwell and basement to lay the main pipes, install the heat pump, and build the central heating room. These measures only indirectly affect the apartments.

 

Schedule

  • Start of work: 13.10.2025
  • Duration per apartment: approx. 3 days
  • Total duration of the measure: approx. 4 weeks

The work in your apartment will be coordinated with you in advance. We will do our best to keep restrictions as low as possible.

 

Advantages for you

  • Higher living comfort through central, uniform heat supply
  • Possibility of individual temperature control
  • Reduced energy consumption and lower CO₂ emissions
  • No modernization surcharge, no increase in net rent as a result of the conversion

 

Planned work on the outdoor facilities

During the outdoor work, there may be unavoidable noise disturbances.
We will make every effort to keep disturbances as low as possible and work closely with the commissioned trades to minimize the duration of the work.

By installing modern heat pumps, we are making an important contribution to the heating transition and thus to a more sustainable future. This new technology brings changes that protect the environment and lead to greater comfort in your living spaces in the long term.

 

Contacts

For questions regarding the measure or other concerns, please contact your property management:

Balandra Verwaltungs GmbH                               
Hardenbergstraße 32                                
10623 Berlin
sager@balandra.de

For questions regarding scheduling or on-site, please contact:

PAUL Tech AG
Phone: +49 621 92 100 111
service@paul.tech

On site, our colleague will also be available during the following office hours:

  • Thursdays from 2:00 p.m. to 5:00 p.m.

 

Thank you for your understanding and your support in implementing this important modernization!